What were the key results of the Turnagain Pre-Feasibility Study (PFS)?

The 2023 Pre-Feasibility Study outlined a 30-year project life with average annual nickel and cobalt output of approximately 37,000 tonnes, a post-tax NPV of US$574 million, and a high-grade concentrate of 18% Ni with 1.1% Co.